|
|
|
- Workmanship and material guaranteed.
|
- Numerous repair innovations.
|
- Butt-fusion welds on modifications.
|
- Various types of welding equipment for different repairs.
|
|
Our welds were tested by one of the big three
auto makers.
Our welds passed the test! |
| Testing was conducted by an independent testing lab for one
of the BIG THREE auto makers. The box was chosen by the customer, shipped to APR for
repair, the shipped to testing facility in Detroit Michigan.Copy of complete results
available upon request. |
|
| Peak force on the repaired box was 18155 lbs! At no time did the
welds break on the container welded by APR Allen Plastics Repair, Inc. |

|
| Dynamic test |
| Simulated shipment of the container by Truck,
Rail,and Air. The container was loaded with 20- 100lbs. sandbags to simulated a load of 1
Ton (2000lbs). |
The container was:
- Dropped from 12" off the ground.
- Subjected to 12 side wall impacts of 5.2 G's.
- vibrated to simulated 2500 miles of travel.
|

|
At
no time did the repair work done by APR Allen Plastics Repair, Inc. fail! |
|
|
|
|